03 / SELECTED WORK

DELIVERED, COMMISSIONEDAND STILL RUNNING.

Railway track running between treesTS-04 · RAIL SAFETY

Track Warning System

Train approach warning deployed across the Sukkur, Lahore and Rawalpindi divisions, on live track so maintenance gangs could keep working between services. At each work zone, axle counters and track-circuit inputs feed a trackside controller that sirens and strobes both ends, with handheld vibration units carried by every gang member.

Location
SUKKUR · LAHORE · RAWALPINDI
Year
2025
Scope
SUPPLY, INSTALL & COMMISSION
Value
PKR 142 M
Scope delivered
  • Axle-counter and track-circuit detection on every work-zone approach
  • Trackside controller computing train speed and arrival time
  • 118 dB sirens, strobes and wearable vibration alert units per gang
  • Gang-leader training and warranty support at all three divisions
OutcomeWarning lead time held above 45 seconds on every commissioning run across the three divisions. Zero work-zone incidents since handover.
Automatic weather station mast with sensors in an open fieldWH-05 · HYDROMET

Automatic Weather Station Network

Twelve automatic weather stations installed across a catchment, each running unattended on solar and reporting to a single dashboard. Site selection, 10 m masts, sensor calibration and GSM backhaul were all delivered in-house, with satellite terminals on the three stations outside cellular coverage.

Location
GILGIT-BALTISTAN & KPK
Year
2025
Scope
EPC + 3-YR O&M
Value
PKR 200 M
Scope delivered
  • Temperature, humidity, wind speed and direction, pressure and rainfall sensors
  • Data loggers with on-site storage and scheduled upload
  • Solar panel and battery sized for 7 days of autonomy
  • 4G and satellite telemetry into one central server
  • 10 m galvanised masts with earthing and lightning protection
OutcomeNetwork has returned 99.1% data availability across its first full monsoon season.
Traffic signal head over a city roadTS-04 · TRAFFIC SYSTEMS

Signalised Corridor Upgrade

Nine intersections re-signalled and brought under one control centre. Existing fixed-time controllers were replaced with detector-fed local controllers, linked back over fibre so timing plans can be changed from the control room instead of at the cabinet.

Location
ISLAMABAD, ICT
Year
2024
Scope
DESIGN–BUILD + MAINTENANCE
Value
PKR 310 M
Scope delivered
  • LED signal heads with turn arrows and pedestrian aspects
  • Inductive loop and radar detection on all approaches
  • Local controllers in roadside cabinets, UPS backed
  • Fibre link from each junction to the central control centre
OutcomePeak-hour queue length on the main corridor down 27% after the first retiming cycle.
Glass automatic sliding entrance doors of a buildingSA-01 · ENTRANCE AUTOMATION

Automatic Entrances — Hospital Block

Thirty-one automatic sliding doors fitted across a working hospital block — OPD, wards and two clean corridors — phased ward by ward so no entrance was out of service during visiting hours. Every leaf is on obstacle detection with breakaway for evacuation.

Location
RAWALPINDI, PUNJAB
Year
2024
Scope
SUPPLY, INSTALL & AMC
Value
PKR 74 M
Scope delivered
  • 31 header units — motor, gearbox, controller and drive belt
  • Microwave motion, infrared presence and touchless wave activation
  • Obstacle detection with emergency breakaway on every leaf
  • Bi-parting and telescopic leaves for the narrow corridor openings
OutcomeRunning on a quarterly AMC since handover, with no door out of service beyond a single shift.
Rows of solar panels in an open fieldRE-02 · SOLAR

1.6 MW Rooftop Solar — Industrial Estate

Rooftop solar across three production sheds, built around the sheds' real shading and roof loading rather than a nameplate figure. Structure design, string layout, inverters, protection and net-metering documentation were delivered as one package, with no interruption to production shifts.

Location
FAISALABAD, PUNJAB
Year
2026
Scope
EPC + 5-YR O&M
Value
PKR 265 M
Scope delivered
  • 1.6 MW of modules on engineered rooftop mounting structure
  • String inverters with DC/AC protection, isolation and metering
  • Per-string generation and fault monitoring over GSM
  • NEPRA net-metering documentation and commissioning tests
OutcomePerformance ratio measured at 81.4% in the first summer. Scheduled cleaning and thermal scans ongoing under O&M.
Street light poles illuminated at nightTS-04 · ROAD LIGHTING

LED Street Lighting — Sector Roads

Replacement of sodium lighting on 11 km of sector roads with LED luminaires on new galvanised poles. Feeder pillars, foundations and underground cabling were all included, and the late-night dimming profile was set with the client after a month of readings.

Location
ISLAMABAD, ICT
Year
2025
Scope
EPCM
Value
PKR 188 M
Scope delivered
  • 412 LED luminaires on galvanised poles, spaced to road class
  • Photocell and astronomical-timer switching with dimming profiles
  • Grid-fed feeder pillars, plus solar poles on two unfed stretches
  • Pole foundations, earthing and underground cabling, tested as-built
OutcomeMeasured energy use on the stretch down 58% against the sodium baseline.